“The landlord is handling it.” Who’s looking out for the tenant?
In a turnkey buildout or build-to-suit, an owner’s representative works on behalf of the tenant through design, construction and move-in, so the facility the landlord delivers meets the operational needs of the business.
I Started Out as the Tenant
I didn’t get into this business as an owner’s rep. I got into it as the tenant who was losing.
In 2000, and again in 2008, I was responsible for broadcast facilities being built out by our landlords. We had a clear set of operational requirements. The general contractor reported to the landlord, and important items kept getting left out.
They weren’t small things.
Increased electrical capacity. Proper cooling for technical rooms. Soundproofing in the walls. Lined ductwork with 90-degree bends and larger volume, so the sound of moving air wouldn’t be picked up by microphones and broadcast to the world.
A broadcast facility can’t operate properly without those systems.
Some requirements were on the drawings, and others weren’t. I understood broadcast operations. I knew how to call “Ready Camera 1, Take 1,” and I knew what the facility needed to function. But my construction education amounted to a high school architecture class. I was a typical tenant, expected to recognize what was missing from construction drawings without the training to do so.
As a result, I was catching problems late and fighting to get them corrected. Whatever the reason those requirements were missing, the result was the same. Our ability to operate was being compromised.
We eventually got the necessary items incorporated. The landlords accepted responsibility for most of the omissions once they were identified. A few items were genuinely outside the agreed scope, and we paid for those.
Those experiences shaped how I approach tenant representation today. If I was running into these problems on sophisticated technical facilities, other tenants were facing them too, usually without anyone on their side who knew what to look for.
Why Is “The Landlord Is Handling It” a Risk?
In a turnkey buildout, the landlord performs Landlord’s Work and controls the design, the pricing, the contractor and the schedule. The contractor reports to the landlord, and the budget is the landlord’s budget.
A landlord who protects that budget is doing the landlord’s job. The tenant lives with the consequences of those decisions for the length of the lease, typically 10 years. Undersized systems, missing electrical capacity and requirements that disappear between the work letter and the construction drawings show up after move-in, when the tenant has the least leverage to fix them.
Most tenants enter construction with a signed lease, a work letter and a reasonable assumption that what they negotiated is what will be built. So who is checking the drawings, specifications and actual construction against what the business needs to operate?
The same concern applies to build-to-suit projects, where a landlord or developer constructs a building for a particular tenant. Those projects add decisions about site planning, infrastructure, utilities, entitlements and future expansion, and the tenant needs to understand how each one affects its operations long before the building is delivered.
What Does an Owner’s Rep Do in a Turnkey Buildout?
The job is to help the tenant define what the business needs, get those requirements into the landlord’s obligations, and verify that they are carried through design, construction and turnover.
The approach is the same for tenant improvements and build-to-suit projects. Larger developments add site planning, entitlements, infrastructure and developer coordination.
Program Definition
Translate business operations into documented facility requirements before the landlord begins design: electrical capacity, cooling, acoustics, technology, security, loading, equipment and future growth.
Lease and Work Letter Review
Work alongside the tenant’s broker and attorney to identify construction requirements, clarify responsibilities, review allowances and make sure the work letter reflects what the tenant expects the landlord to deliver.
Design Review
Review drawings and specifications as they develop, check them against the tenant’s program, and flag omissions, conflicts and operational problems while they’re still inexpensive to fix.
Budget and Change Control
Review construction pricing, allowances and proposed change orders. Separate genuine tenant changes from work the landlord already owes.
Construction Oversight
Attend the project meetings that matter, walk the site, track progress and catch differences between the approved documents and what’s being installed, while they can still be corrected without tearing out finished work.
Turnover and Move-In
Coordinate punch lists, testing of critical systems, closeout documents, and the tenant’s technology, furniture, equipment and relocation. The goal is a space that works on the first day of occupancy.
Doesn’t My Broker Already Handle This?
Your broker negotiates the lease, the economics, the tenant improvement allowance and the landlord’s obligations. A good broker may also stay involved when construction issues come up.
But negotiating what the landlord agrees to provide and verifying what actually gets designed and built require different expertise.
An owner’s rep reviews the drawings, checks that operational requirements have been incorporated, monitors construction and identifies discrepancies before they become expensive problems.
That representation has a cost, and not every tenant or project needs it. When a business depends on specialized systems, significant infrastructure or a complex buildout, the cost of discovering a critical omission after move-in can far exceed the cost of identifying it during design or construction.
The owner’s rep works alongside the broker and attorney where appropriate, providing technical and construction oversight that complements their roles. The tenant gains independent representation through delivery, when the consequences of construction decisions become real.
Relevant Experience
My experience includes representing both tenants and owners across technically demanding facilities, major relocations and ground-up development.
- Broadcast facilities as the tenant (2000 and 2008). Direct responsibility for two landlord-delivered broadcast buildouts, including resolving discrepancies involving electrical capacity, cooling, acoustics and operational requirements.
- 135,000-square-foot broadcast facility, Long Island. Owner’s representative for a 24/7 technical facility requiring extensive coordination of building systems and operational needs.
- More than $500 million in ground-up development. Including a 270-unit, $382 million residential high-rise in the Bronx.
- Office relocations and restacks. Projects of up to 300,000 square feet across Long Island and the New York metropolitan area.
Talk Before You Sign
The best time to involve an owner’s representative is before the lease and work letter are finalized, while the tenant’s operational requirements can still be written into the landlord’s contractual obligations.
If you’re planning a full-floor tenant improvement, a turnkey buildout or a build-to-suit project in New York City, Long Island or the surrounding metropolitan area, I’d welcome a conversation about your project.